FORMAL PUBLIC COMPLAINT & OPEN LETTER

GURUGRAM: MCG & GMDA ACCOUNTABILITY – GROUND-LEVEL FAILURE OF ROAD CLEANING, DUST CONTROL AND PUBLIC INFRASTRUCTURE

To:

  1. Commissioner, Municipal Corporation of Gurugram (MCG)
  2. CEO, Gurugram Metropolitan Development Authority (GMDA)
  3. National Green Tribunal (NGT)
  4. Central Pollution Control Board (CPCB)
  5. Commission for Air Quality Management (CAQM)
  6. State Vigilance & Anti-Corruption Bureau, Haryana

Date: 02 November 2026

Subject: Evidence-based complaint regarding roadside dust pollution, inadequate mechanical road sweeping, unpaved road shoulders, pedestrian infrastructure deficiencies and suspected irregularities in public cleaning and maintenance contracts in Sushant Lok III, Sector 57, Gurugram.

Respected Sir/Madam,

I am submitting this formal complaint with GPS-stamped photographic evidence documenting the actual ground conditions in Sushant Lok III, Sector 57, Gurugram.













The photographs were captured on 02 November 2026 between 5:23 PM and 5:25 PM.

These photographs raise serious questions about the effectiveness of MCG and GMDA's ground-level sanitation, road maintenance and dust-control arrangements.

1. Photographic evidence – Actual ground conditions

Location A: C26, Block C, Sushant Lok III, Sector 57, Gurugram

Date: 02 November 2026
Time: 05:25 PM
GPS: 28.420119° N, 77.076848° E

Observed conditions:

  • Significant visible roadside dust accumulation.
  • Wide unpaved road-edge/shoulder area.
  • Dust and loose material along the road kerb.
  • Debris and vegetation along the roadside.
  • Need for proper mechanical road sweeping and removal of accumulated material.

Location B: 3545B, Dharm Marg, Boom Plaza, Block C, Sushant Lok III, Sector 57, Gurugram

Date: 02 November 2026
Time: 05:23 PM
GPS: 28.422512° N, 77.075717° E

Observed conditions:

  • Visible roadside dust and litter accumulation.
  • Unpaved and uneven road-edge area.
  • Footpath condition and pedestrian accessibility concerns.
  • Roadside parking and obstruction of pedestrian space.

These are two separate GPS-recorded locations within Sector 57. The photographs demonstrate why physical inspections, rather than paper-based compliance reports, are necessary.

2. Major concerns requiring investigation

A. Roadside Dust and Air Pollution

Why is deposited roadside dust not being removed regularly?

Why is mechanical road sweeping not effectively covering road edges and shoulders?

Has MCG or GMDA conducted any scientific assessment of roadside dust as a source of PM10 and PM2.5?

B. Road Cleaning Contracts

Please disclose:

  • Names of cleaning contractors.
  • Tender amounts and contract periods.
  • Daily machine deployment records.
  • GPS-based machine tracking.
  • Road-wise cleaning schedules.
  • Actual quantity of dust and silt collected and transported.
  • Contractor payments and penalty records.

C. Ground-Level Work versus Paper Compliance

मिट्टी वही की वही सिर्फ कागजों पर सफाई।

क्या सफाई के नाम पर मिट्टी को एक स्थान से दूसरे स्थान पर स्थानांतरित करके काम पूरा दिखाया जा रहा है?

क्या Work Completion Certificates वास्तविक ground inspection के बाद जारी किए जाते हैं?

ठेकेदारो और सरकारी साठ गांठ से सुनियोजित corruption

इस संभावित मिलीभगत और वित्तीय अनियमितताओं की स्वतंत्र जांच होनी चाहिए।

D. Pedestrian Safety and Road Infrastructure

Broken footpaths, unpaved shoulders and roadside obstructions require immediate inspection.

लोग सड़क के बीच चलने को मजबूर हैं। सड़क दुर्घटनाओं की रोकथाम के लिए MCG और GMDA अपनी जिम्मेदारी स्पष्ट करें।

3. Specific demands for immediate action

  1. Conduct a joint MCG–GMDA inspection at both GPS-recorded locations.
  2. Arrange proper mechanical sweeping and removal of roadside dust.
  3. Remove accumulated silt and debris through an approved disposal process.
  4. Repair uneven footpath and road-edge sections.
  5. Inspect roadside parking and pedestrian obstructions.
  6. Conduct an independent audit of the cleaning contractor's performance.
  7. Verify contractor bills against actual machine deployment and completed work.
  8. Undertake scientific PM10 and PM2.5 monitoring at relevant roadside locations.
  9. Publish inspection photographs and corrective action reports.
  10. Refer evidence of suspected financial irregularities to the appropriate Vigilance Authority.

4. Accountability – Government employees and contractors

जनता की गलती पर पेनाल्टी, सजा तो सरकारी कर्मचारियों पर मैनिपुलेटेड ट्रूथ के लिए पेनाल्टी ओर जेल का प्रावधान क्यों मिसिंग।

सरकारी कर्मचारियों ओर ठेकेदारों की मिलीभगत से सुनियोजित करप्शन।

If investigation establishes deliberate negligence, false certification, manipulation of records or corruption, appropriate departmental, financial and criminal action should follow under applicable law.

Accountability must apply equally to citizens, contractors and public officials.

5. Time-bound implementation

Timeline Expected action
7 days Acknowledge complaint and assign responsible officers
15 days Joint physical inspection and photographic report
30 days Road cleaning, dust removal and footpath corrective action
45 days Contractor and payment verification
60 days Vigilance findings, where investigation is warranted
90 days Publicly accessible corrective action and monitoring report

6. Policy reform – From paper governance to measurable governance

Policy को एक बार का निर्णय नहीं, बल्कि लगातार सुधार की प्रक्रिया

आज का विचार कल की policy बन सकता है। आज का छोटा innovation कल का national infrastructure बन सकता है। और आज की जिम्मेदार सोच आने वाली पीढ़ियों के लिए बेहतर भारत की नींव बन सकती है।

We expect a corruption-free, data-driven, AI-based and citizen-centric governance system.

Every road cleaning contract should have:

  • GPS-enabled monitoring.
  • Geo-tagged before-and-after photographs.
  • Independent quality verification.
  • Public performance dashboards.
  • Payment linked to verified work.
  • Penalties for repeated non-performance.

7. Final appeal

सरकार का परफॉर्मेंस and अकाउंटेबिलिटी missing

24 घंटे, कागजों पर काम दिखाया अब ग्राउंड पर भी कुछ करके दिखाए।

जनता ने समय पर Tax दिया है। क्या सरकार ने अपना काम ईमानदारी से किया?

स्वच्छ शहर रेटिंग एजेंसी ध्यान दे पूरे शहर में सफाई का यही हाल।

देश को शर्मसार करती स्वच्छता व्यवस्था।

एक अच्छा विचार तभी मूल्यवान बनता है जब वह किसी समस्या का समाधान खोजने में मदद करे।

We do not need another assurance or paper-based compliance report. We need visible, measurable and independently verified results.

MCG AND GMDA जवाबदेही।

कागजों से बाहर आइए। Ground पर काम करके दिखाइए।

I request all concerned authorities to register this complaint, conduct a time-bound investigation and provide an Action Taken Report.

Yours faithfully,

A Concerned Citizen
Gurugram, Haryana

Attachments:

  • Annexure A – GPS-stamped photograph, C26, Sushant Lok III, Sector 57 (05:25 PM, 02 November 2026).
  • Annexure B – GPS-stamped photograph, Dharm Marg, Boom Plaza, Sushant Lok III, Sector 57 (05:23 PM, 02 November 2026).

 Urgent: GPS-Verified Evidence of Roadside Dust Pollution and Poor Sanitation – Request for Joint MCG–GMDA Inspection and Independent Contractor Audit, Sector 57, Gurugram.


सवाल किसी एक सड़क या एक विभाग का नहीं है। सवाल है कि Public Money खर्च होने के बावजूद नागरिकों को बुनियादी नागरिक सुविधाएँ क्यों नहीं मिल रही हैं और इसके लिए जवाबदेह कौन है?

Statutory responsibility

Authority Specific accountability requested

MCG Commissioner Road cleaning, sanitation, dust suppression, footpaths, contractors and municipal maintenance

GMDA CEO Road infrastructure, stormwater drainage, road maintenance and infrastructure coordination

CAQM / CPCB NCR air pollution, road dust assessment, pollution monitoring and applicable air-quality compliance

NGT Environmental grievance, consideration of environmental violations and appropriate directions within its jurisdiction

Haryana State Vigilance & Anti-Corruption Bureau Investigation of suspected corruption, misuse of public funds, irregular tendering and contractor-related financial irregularities, wherever supported by evidence


No comments: